1. Background
These General Conditions govern (unless otherwise stipulated by virtue of a written agreement and in an express manner between the parties) the obligations arising from the contractual relationships entered into by SCS Venturini Srl (hereinafter SCS) and from acts or facts performed by employees, agents and appointees of the latter; these General Conditions also define, to the extent and in the manner provided for, the liability of SCS.
2. Definitions
In these General Conditions, the following terms have the meanings specified below:
(a) Forwarder: the person who receives the shipping order for the purpose of entering into the contract of carriage and/or performing one or more ancillary operations
(b) SCS: the person who physically performs all or part of the transportation, or assumes (by ad hoc agreement) expressly the performance of the same
(c) Principal: the person who mandates shipping to enter into the contract of carriage and/or to perform one or more ancillary operations
(d) Shipper: the entity that is the shipper or shipper under the transportation contract entered into by SCS.
(e) Carrier: the person who physically performs or assumes the performance of transportation.
3. Scope of application.
The Principal expressly agrees, both when acting on his own behalf and when acting for others in entering into the contract of shipment and/or transportation, that these General Conditions shall have and find full and unconditional application to all contractual relations with the SCS, as well as to all actions and claims, including those of a non-contractual nature, against the latter.
4. Recruitment/acceptance of assignments.
SCS, as a result of the mandate received, as a rule in writing, will enter into the contract of carriage as well as carry out the ancillary operations, acting with the necessary discretion, with the power to carry out the shipment of the goods by grouping them with others (unless otherwise ordered in writing) always acting with the utmost diligence, acting as a shipper and not already as a shipper-carrier.
SCS, except by prior written agreement, does not accept the performance of shipping and/or transportation activities related to dangerous goods, which may cause harm to people, animals, other goods or property, or are subject to deterioration, are unpacked or have insufficient/inadequate packaging, as well as valuables, coins, precious goods, works of art. By way of example and not exhaustively, dangerous goods means goods classified as hazardous by IATA, IMO, ICAO, or covered by the ADR/RID regulations.
If such goods are entrusted to SCS without its prior consent, or SCS accepts the mandate on the basis of erroneous, incomplete, or untrue indications with respect to the nature or value of the goods, SCS shall have the right to terminate the contract, or, if circumstances so require, to refuse, deposit, or otherwise dispose of the goods, or even, in case of danger, to proceed to their destruction, and the Principal and/or Shipper shall in such case be liable for all harmful consequences and expenses that may arise in various capacities therefrom.
5. Delivery terms
SCS does not guarantee adherence to delivery deadlines, and therefore cannot be held responsible under any circumstances for delays in pickup and transportation and/or delivery of any shipment regardless of the cause of such delays or requests by the Principal for particular delivery deadlines even if resulting from the shipping documents.
6. Representations and warranties of the Principal/Sender
The Principal and the Shipper warrant and therefore state:
- That the shipment was correctly and accurately described in all shipping documents;
- that they have taken note of the goods or commodities that SCShas declared unacceptable for transportation, and that the same have not been included in the shipment;
- that the nature of the goods, number, quantity, quality, contents of packages, gross weight (including the weight of packages and pallets and the bulk of the same), dimensions and any other information given are true and correct;
- That the packaging and labeling used, in relation to the goods contained and the mode of transport, are considered suitable.
The Principal and Shipper expressly declare that they indemnify and hold SCS harmless from all damages, claims, or expenses of any nature whatsoever that may arise from the breach of the above warranties, as well as from the lack, insufficiency, or inadequacy of packaging, or from the failure to indicate on the goods and packages the precautions necessary for their handling and lifting.
Where SCS is mandated to carry out and take care of customs operations, the Principal and/or Shipper shall guarantee that the documentation accompanying the goods is authentic, complete and free of irregularities, and that the goods strictly correspond to the type described, comply with applicable regulations, are of free export/import, and are in compliance with the marking.
The Principal and/or Shipper are also required to provide in a timely manner all information, data, customs codes, heading and customs classification of the goods, and all documents necessary to initiate customs operations.
In addition, the Principal and/or the Shipper authorize the SCS to manage all the data of the shipment, possibly even those data that could have the nature of so-called sensitive data, in order to allow the SCS to deal with all the paperwork, of an administrative and/or operational nature, that may need to be fulfilled telematically in order to guarantee the shipment the best assistance.
7. Forwarder’s Quotations
Quotes from the SCSand agreements on prices and conditions refer only and always to specified services and do not include, unless otherwise agreed, additional costs resulting from operations performed outside normal working hours. Unless otherwise agreed, they are binding only for goods of normal volume, size, weight, and quality in relation to the intended mode of transportation.
8. Forwarder’s advances and credits
If, as a result of existing agreements, SCS provides advance freight, transportation fees, container rental, duties and expenses, and other sums, for any reason whatsoever, the Principal and/or Shipper shall be liable to pay the amount due for such advance, interest for any delays, and any losses due to changes in the exchange ratio between currencies.
The Principal and/or Shipper shall hold SCS fully harmless from claims for freight, duties, taxes, spoilage contributions, fines, or other sums for any reason required of SCS. Where sums and fees due to the SCS are placed on the consignee’s or third party’s account, the Principal and/or Shipper shall remain obligated to pay the same immediately if for any reason the SCS does not receive prompt and spontaneous payment of the sums due to it.
Unless otherwise agreed, no sum due to the shipper may be offset against any other sum claimed by the Shipper and/or Principal for any reason whatsoever.
9. Right of retention
SCS shall have, against the Principal, Shipper and any other person with whom it contracts, a lien and right of retention on the goods and other property in its possession in connection with accounts receivable that are past due or in arrears, and it may also claim such right against the consignee and/or owner of the goods.
10. Operational exceptions: delay or refusal to load or receive goods
The Shipper and/or Principal shall reimburse and hold SCS harmless in respect of any sum or cost due, including those for stopovers of means of transportation, including containers, swap bodies and the like, for the return of the goods to the warehouse, for storage and subsequent redelivery.
In the event of refusal or unavailability of the consignee, the SCS, if promptly informed of the storage and entitled to intervene, may take the necessary or appropriate measures for the safekeeping of the goods and their return, acting in the name and on behalf of the Principal and/or the Consignor, on whom the risk of any loss, damage or misappropriation rests.
11. Liability
11.1 The SCS is not responsible for the execution of the transportation but only for the execution of the mandate received, as well as any ancillary obligations.
11.2 The liability of the Forwarder-Carrier, when provided for and attributable to him, in relation to any damages and claims arising from the entrusted shipping and/or transportation operations, including any technical stoppages, shall not exceed the compensation limit invocable by the Forwarder and/or the Carrier under and by effect of the uniform legislation applicable to each individual shipment or the national law applicable to the individual transportation and/or shipment, including Italian law, and in any case the compensation limit applicable to and invocable by the carrier actually performing the transportation.
Technical stopover means the stopping of goods in a storage area, or in a warehouse or terminal or other shelter area, for needs related to the execution or continuation of transportation, or otherwise related to the need to guard the goods during the course of transportation or pending delivery to the carrier or consignee.
12. Damage occurred in unknown route
For the eventuality that it is impossible to identify the section of the transport in which the damage or loss occurred, as well as for the eventuality that the damage or loss occurs in a stage of storage and/or warehousing not configurable as a technical stopover (including therefore free or courtesy storage) performed by the SCS using its own facilities or by its auxiliaries, or again for the event that the warehouseman or auxiliary in the storage and/or handling stage cannot invoke compensation limits, the maximum limit of 8.33 special drawing rights per kilo of goods lost or damaged will apply.
13. Indirect damages
It is in any case excluded, and so much is also provided for in derogation of Articles 1223 et seq. of the Civil Code, any compensation due from SCS for indirect damages (such as, with indication that is purely illustrative in nature and is in no way exhaustive: loss of earnings, loss of interest or damages resulting from delays in the execution of the transport).
In particular, for shipments of samples and of goods or merchandise that the principal or shipper has expressly designated as destined for fairs, exhibitions, events, and the like, compensation (if due) is limited to the amount of freight agreed upon when quoting the shipping service.
14. Complaints
Any claim for loss, misdelivery, damage or damage must be made in writing and sent to the SCS (including by PEC: scsinternational@pec.it) strictly within the time limits applicable by effect of the uniform or statutory regulations in Article 11.
15. Insurance
If the Principal intends to insure the risk of damage or loss to the goods, he may instruct the SCS to arrange for insurance coverage on behalf of the claimant. The costs of the said coverage will in such case be specified in the quotation of the SCS.
In the absence of express instructions from the Principal, any coverage, provided it is requested in writing, is taken out for ordinary risks only, in the usual forms of insurance for the account of the person to whom it is owed or on behalf of others or by subscription. Under no circumstances may SCS be considered as an insurer or co-insurer.
Alternatively, the Principal may arrange for the shipment and/or transportation to be insured directly, it being understood that, in this event, the relevant policy must contain an express waiver of the insurer’s right of recourse against SCS.
The SCS has no obligation to act to achieve insurance indemnity, interrupt statute of limitations periods, take care of the performance of the expert’s work, unless instructed to do so by the Principal for a fee to be agreed on an ad hoc basis.
16. Causes of force majeure
Under no circumstances shall SCS be liable for any loss, damage, delay, wrong or non-delivery caused by unforeseeable circumstances, exempt causes provided for in the uniform or statutory regulations referred to in Article 11, and otherwise by circumstances beyond its control. These include, but are not limited to: (a) natural disasters (b) cases of force majeure such as wars, accidents/damage to means of transportation or embargoes, riots or civil uprisings; (c) defects, inherent characteristics or flaws in the goods; (d) acts, defaults or omissions of the Shipper, consignee or anyone else having an interest in the shipment, State, Customs or Postal Administration or other Competent Authority (e) strikes, lockouts or labor conflicts; (f) prohibitions by laws or regulations; including U.S. law, European Union law or national legislations.
17. JURISDICTION
For any and all disputes the Court of Macerata will have exclusive jurisdiction.